Procedure for the consideration of the uncertainty in an integrated industrial complex
Keywords:
Processes integration, uncertainty, total site integrationAbstract
For several years a great attention to the diversification of the industry of the sugar cane, looking for alternative has been lent more attractive through the processes integration that tend to cleaner technologies, taking advantage the material and energy resources of the involved processes but methodology that guarantees the maximum reliability of the integrated system. In the present work intends a methodology that considers the uncertainty in the reliability of the total site integration and related in the mass and energy balance, sets out to be closely tie as much to the sizing of the equipment in the design, like a the analysis in the conditions of the process, which diminishes the risk of the investment of the integrated system.